FLEX/S

Planning

Optimally plan your production, maintenance, and quality processes with dynamic scheduling supported by smart algorithms. Make your workflow efficient, manage your schedule, and advance your operations without disruption.

Production Plan

FlowMio facilitates the creation of production plans based on orders and capacity. Optimal planning is achieved by considering product priorities, deadlines, work centers, and resources. Every step from the beginning to the end of the production process can be tracked, and plan deviations are detected in real-time, enabling rapid intervention.

Production plan

Maintenance Plan

FlowMio allows you to create detailed maintenance plans for your equipment. Time-based, counter-based, or condition-based periodic maintenance is planned in advance, minimizing breakdown risks. Maintenance dates, responsible teams, and required spare parts can be defined in the system, thus ensuring an uninterrupted production infrastructure.

Maintenance plan

Date
Thu 14:00
Team
Mechanical team

Spare parts

Filter kitLubricant

Integrated Scheduling

FlowMio allows you to manage production, maintenance, and quality processes in an integrated manner on a single schedule. Conflicts and resource collisions are analyzed and alerted by the system in advance. This increases inter-departmental coordination and ensures adherence to planning.

Integrated schedule

ProductionMaintenanceQuality
MonTueWedThuFri

Quality Plan

Product-based, operation-based, or customer-based quality plans are defined, configuring the necessary checks for each production step in advance. Details such as which measurements to take, how often, and by whom are clarified. This planning prevents non-standard production and makes the quality assurance system sustainable in the digital environment.

Quality plan

Measurement
Torque · 42 Nm ±2
Frequency
Every 10 pcs
Owner
QC operator

Dynamic Field/Line Scheduling

Production lines in the field can be replanned based on real-time data. The system automatically updates the schedule according to potential delays, downtimes, or sudden order changes in production. This enhances agility on the production line and minimizes waste.

Dynamic rescheduling

Line B

Original

Updated

Schedule shifted automatically

OHS Plans

Occupational health and safety plans can be defined in the system on an equipment and process basis. Hazard classes, control measures, responsible personnel, and implementation times are integrated into the plans. Audit and improvement activities can be tracked according to this plan. Thus, the production process is carried out in compliance with employee safety.

OHS plan

Training Planning

Training to be assigned to employees in line with new equipment, process changes, or quality requirements can be planned through the system. It is determined which personnel will receive training, when, and on what subject, making tracking easier. It contributes to creating a compliant and conscious production team.

Training schedule

Training
MonTueWedThuFri

Flexible BOM/BOA/Route Definition

With FlowMio, Bills of Materials (BOM), Bills of Assets (BOA), and production routes can be defined flexibly. Alternative routes, substitute materials, and production variations can be created with scenarios in the system. This flexibility enables the production plan to quickly adapt to changing conditions.

Flexible definitions

Product familyConfigurableAlt BOMSubstitute OKAsset setLine specificAlt routeScenario B

Gantt Chart

The entire production process is visually planned and monitored on a Gantt chart. All operations from order to shipment are located on the timeline. Delays, critical path analyses, and resource assignments are easily managed through this chart. This provides the planning department with a powerful control capability.

Gantt chart

Want to see this module live?

Book a demo and we will map these capabilities to your shop floor.